Who supplies the production ingredients?+
For runs below 25,000 total sticks, you supply all production ingredients and the complete flavor system. At 25,000+ total sticks across all SKUs / flavors, ingredient sourcing is available by separate quote, subject to formula review and supplier requirements. Packaging sourcing and formulation sample development remain available for smaller runs.
What types of coffee and tea products can you review?+
We review instant coffee, tea powders, and dry functional beverage blends for formulation, blending, and stick-pack production. Share the exact base powder, complete formula or product brief, and preparation instructions. Material suitability and the manufacturing scope are confirmed for the actual project.
Is this ready-to-drink coffee or liquid filling?+
No. This offering covers dry powders and related dry ingredient blends in stick packs. The customer adds liquid when preparing the drink. Ready-to-drink liquid filling is outside this offering.
Can I bring a finished blend from my current supplier?+
Yes. Share the blend specifications, intended preparation, grams per stick, total order quantity, and flavor split. We review suitability and packaging requirements before confirming the filling scope. You can keep your supplier and discuss stick filling with us.
Can you develop a custom coffee or functional beverage formula?+
Yes, we can scope custom powder formulation around your product brief. The confirmed formulation offer is $3,500 per formula/flavor for one agreed scope, paid 100% upfront after scope confirmation. The full process generally takes 6–8 weeks once payment, the brief, and required materials are ready. Complex blends, material availability, and feedback can extend it. Manufacturing and materials are separate.
Will the powder dissolve instantly in hot and cold water?+
That needs evaluation with the actual formula and preparation method. Tell us the liquid, volume, temperature, and mixing method you want customers to use, along with acceptable texture and settling. An online filling price does not confirm dissolving or mixing performance.
What is the minimum order?+
The online calculator starts at 7,500 total sticks. Smaller quantities can be discussed through a custom quote. Flavor splits, film requirements, and material purchasing minimums are reviewed separately. The calculator covers 1–12 g fills; other fills also need a custom review.
Is 8 g the right serving size for my coffee?+
The default 8 g is a pricing reference, not a recommended serving. Use the weight of your complete blend, including the base, flavor, sweeteners, and other ingredients. The recipe and powder properties determine the serving and packaging requirements.
Does the calculator include coffee, flavor, and printed packaging?+
No. It shows tolling labor for blending, filling, sealing, and agreed retail packout, with one formula/flavor and customer-supplied ingredients and packaging. Ingredient and flavor costs depend on the actual formula. Packaging and optional services can be scoped in the full quote. Testing, freight, and taxes are outside the tolling estimate.
Can I order multiple flavors?+
Yes, share the total quantity and the split for each flavor. Each manufacturing SKU/flavor after the first adds $400 in the full quote. That does not pay for developing another formula. Film requirements, material purchases, and per-flavor production quantities still need confirmation. A 15,000-stick order across two flavors means 15,000 total sticks, not 15,000 per flavor.
Can I get samples in blank sticks before production?+
Optional powder analysis includes evaluation and blank-stick samples using a blend or ingredients you supply. It is separate from formulation taste samples, ingredient sourcing, and production. It does not automatically come with sourcing or packaging, and it is not a full laboratory-testing or stability-study package.
Who handles the manufacturing?+
StickPax coordinates manufacturing through our partner EnviroStar. The actual formula, materials, packaging, and production requirements are reviewed and agreed before the run.